[Archived] Question #14: Provide a breakdown of the specific projects programmed for FY 2019 – FY 2021 as part of the Athletic Field Improvements capital project.

Question:

Provide a breakdown of the specific projects programmed for FY 2019 – FY 2021 as part of the Athletic Field Improvements capital project.

Response:

The initiatives included in the FY 2019 – FY 2028 Proposed CIP for the Athletic Field Improvements Project are as described below. The design phases include all costs for design, engineering, survey, geotechnical work, environmental engineering, including stormwater, and permitting. Construction phases include construction costs, construction management, inspection, and construction contingency. Additionally, this project provides funding for a capitalized staff position for RPCA capital projects.